Brighton High School

Canyons School District

Rebuilding Brighton High School required careful coordination and strict safety procedures to construct the new, massive school within feet of the old one.  

Kelly Hall

Superintendent

“One major challenge was cutting the existing building in half while keeping it functional for students.”

Project Details

  • 399,000 Square Feet • 2022

  • Cottonwood Heights, UT

    • 2022 K12 Project of the Year | Associated General Contractors of Utah

    • 2023 Excellence in Concrete Award | American Concrete Institute Intermountain Chapter

    • 2023 Excellence in Masonry Design | Utah Masonry Council

Hogan developed a seven-phase rebuild plan and systematically replaced the high school on a 35-acre site with a 34-foot grade change.

Brighton High School is a three-story, next-generation learning environment with ample natural light and a collegiate aesthetic. It is designed and constructed to focus on openness, visibility, flexibility, collaboration, adaptability, and technology.


“To have the contractors also look [at] a project with an eye on students first was surprising and refreshing.”

Tom Sherwood, Director of High Schools

Canyons School District